Diesel Tank Installations – Structural Inspection & Sign-Off Review, Toronto

Parsways performed an independent inspection and structural conformance review for the installation of diesel fuel tanks T352 and T353, including saddle anchors, concrete pads, mechanical pipe supports, and access systems — ensuring fabrication and installation fully aligned with the approved shop drawings, contract documents, and project specifications, with no deviations from the design intent.

1 | Project Overview

Location: Arrow Road Garage, Toronto, Ontario
Completion: 2024
Sector: Transportation / Industrial

Scope Highlights

  • Structural site review and sign-off for diesel tank installations.

  • Inspection of saddle anchors, Hilti HSL4 bolts, and concrete pads.

  • Verification of pipe supports and scaffold stair assemblies.

  • Certification for compliance with CSA S16, OBC Part 4, and manufacturer requirements.

2 | The Challenge

  • Reviewed shop drawings for tank saddles, anchors, and framing details.

  • Conducted on-site inspection of fabrication and installation sequence.

  • Checked anchor embedment, spacing, and alignment vs. design.

  • Verified pipe hanger supports and anchorage workmanship.

  • Issued engineer-sealed conformance letters confirming code compliance.

3 | Engineering Results

  • Diesel tank assemblies certified for structural adequacy and safety.

  • No deviation between installation and approved drawings.

  • Verified anchorage performance and saddle-to-pad connections.

  • Final inspection records and sign-off certifications delivered to TTC.