Existing Mezzanine Structural Assessment – Orleans

Parsways completed a structural assessment of an existing pre-engineered steel mezzanine within a commercial facility in Orleans, Ontario.


The review evaluated the existing framing system, structural members, and overall load-carrying capacity in accordance with applicable Ontario structural engineering standards.

Location: Orleans, Ontario
Completion: July 2026

Sector: Commercial

1. The Challenge

An existing steel mezzanine required a structural engineering assessment to verify its suitability for continued commercial use.


Existing Structural Review:
The assessment focused exclusively on the existing mezzanine superstructure and supporting framing.


Capacity Verification:
The existing framing system required evaluation for applicable gravity loading conditions.


Stability Requirements:
The overall structural stability of the mezzanine required confirmation in accordance with Ontario Building Code requirements.

2. The Engineering Solution

A structural assessment was completed using field observations, measured dimensions, and manufacturer information.

​

a) Framing Evaluation:

Existing steel framing members were reviewed to verify the structural system.

​

b) Code Compliance Review:

The assessment was completed in accordance with the Ontario Building Code and applicable CSA standards.

​

c) Lateral Stability Assessment:

The required lateral bracing system was confirmed based on the original manufacturer's requirements.

3. The Outcome

The assessment verified the structural performance of the existing mezzanine framing for the reviewed loading conditions and established the lateral bracing requirements necessary to achieve a safe, code-compliant structural system for continued commercial use in accordance with the Ontario Building Code and applicable CSA standards.

Need Structural Support for Your Next Project?

We provide engineered designs and on-site verification to ensure long-term safety and compliance.