Scaffold Stair & Platform Modification – Structural Inspection & Site Review, Toronto
Parsways performed an independent inspection and structural conformance verification for the scaffold stair access system and associated steel platform modifications, ensuring full alignment between fabrication, installation, and approved shop drawings — with no field deviations from contract documents or project specifications.




1 | Project Overview
2 | The Challenge
3 | Engineering Results
Location: Arrow Road Garage, Toronto, Ontario
Completion: 2024
Sector: Transportation / Industrial
Scope Highlights
-
Structural review of modified steel platform for diesel tanks.
-
Inspected and signed off scaffold stair (Safway system).
-
Verified fabrication and erection per approved drawings.
-
Certified to CSA S16, OBC Part 4, and TTC standards.
-
Reviewed shop drawings for platform cuts and temporary framing.
-
Inspected steel cut-outs, anchors, and welded connections.
-
Checked scaffold stair installation and guardrails for stability.
-
Verified field work vs. contract documents—no deviation observed.
-
Issued engineer stamped sign-off confirming structural adequacy and compliance.
-
Platform modifications and scaffold stairs certified code-compliant.
-
No deviation between installation and approved fabrication details.
-
Safe, stable access system supporting continuous construction operations.
-
Inspection records and conformance certification delivered to TTC and client.